Skip to content
Underground power trench in Moorebank
Level 2 electrical

Overhead to Underground Conversion Liverpool

The wire over your driveway replaced with cable in conduit, so trucks, carports and storms stop being a worry.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

An overhead service line is the most exposed part of your supply. In the Liverpool area it’s the line that gets hit by storm branches, clipped by trucks, and stands in the way of a new carport or second storey. An overhead to underground conversion replaces it with cable in conduit running from the street pole or pit to your meter board.

Why Liverpool owners go underground

Carports and garages. Many homes in Casula, Moorebank and Wattle Grove are adding double carports. A line over the driveway limits how high they can go.

Caravans, boats and trucks. A low line over the driveway is a hazard for anything tall.

Second storeys. Building up usually means the raiser no longer works.

Knockdown rebuilds. The site is open, so trenching is easy.

Acreage. Long private lines through trees on the western fringe are maintenance headaches. Underground ends them.

Storms. Fewer exposed wires means fewer storm call-outs.

On an overhead street

Most established Liverpool streets have overhead mains on timber poles. We fit conduit up the street pole, trench or bore to your property, and run the cable to your meter board. Endeavour connects at the pole. The old line and raiser come off once the new cable is live.

On an underground street

Newer estates have pits at the boundary. There it’s a short run to the meter board, often combined with a consumer mains upgrade.

On acreage

On larger blocks in Austral and the western fringe, the private line can run a long way. Taking it underground removes poles that would otherwise need replacing, and ends vegetation and clearance defect notices. See private power pole replacement if you’d rather keep the line overhead.

Planning the route

We plan around gardens, slabs, pools, water and gas. We bore under paving and driveways where we can, rather than cutting them. On acreage we look at the shortest practical route and where pits are needed.

The application

Undergrounding needs an application to Endeavour Energy. We lodge and manage it.

During a rebuild

On a knockdown rebuild, the trench goes in before the driveway is poured. The old house is disconnected first with a power disconnection and reconnection, and site power runs the build.

Thinking ahead

If you might add three phase, a granny flat or an EV charger later, we can size the conduit for it now. It costs little extra and avoids digging again.

Your yard afterwards

The trench is backfilled and compacted, turf or garden beds are reinstated as agreed, and the old wire and raiser come off the house.

How long it takes

Trenching and laying usually take a day or two. The cut-over, when the house switches to the new cable, is a short outage.

Where we work

Undergrounding jobs come in from across the area, including carports and rebuilds in level 2 electrician Moorebank and acreage in Austral.

Pits and spare capacity

Long runs, especially on acreage, get pits where the route turns so cable can be replaced later without digging. If three phase or a second dwelling might come later, tell us and we’ll size the conduit for it.

Trees and roots

Big gums and fig trees have big roots. We route the trench to avoid damaging them, or bore underneath where we can.

Acreage examples

On a rural block, the private line might run a hundred metres or more across a paddock, through trees and past sheds. Taking it underground removes every pole on the way, ends tree trimming and clearance notices, and frees up the land. We plan the trench around tracks, dams and irrigation.

Get a price

Call the level 2 electrician Liverpool team for a site look and a fixed written price.

Updated

Cost depends on distance, what the trench crosses, whether we bore under concrete and Endeavour Energy's requirements at the pole. We give a fixed price after a site look.

What good overhead to underground conversion looks like

Close-up of overhead to underground conversion on a home in the Liverpool area
What overhead to underground conversion looks like up close on a typical Liverpool area home.
Signs that overhead to underground conversion needs attention
Typical signs that it needs attention.

Overhead to Underground Conversion in Liverpool: step by step

  1. Plan the routeStreet pole or pit to meter board, around everything in the way.
  2. Apply to EndeavourApplication lodged and the connection point confirmed.
  3. Dig and layTrench or bore, conduit, pits and cable installed.
  4. Switch overNew cable connected, old line and raiser removed, certified.

Overhead to Underground Conversion questions in Liverpool

Something else on your mind? Call 02 9158 9916 and ask.

Can a long acreage line go underground?

Often, yes. It removes poles, tree problems and defect notices in one go.

Do you need to cut our driveway?

Usually not. We can bore underneath it.

Is it worth doing during a knockdown rebuild?

Yes. The site is already open and the new home can be designed without a raiser.

Need a Level 2 electrician in Liverpool?

📞 Call now Free quote